
New roof in Lake Oswego? We take the solar down and put it back
Roof work on a Lake Oswego home with solar? We detach the panels, store them, and reinstall them.
5.0 on Google | 106 reviews | CCB 202002
The Tree Code and a re-roof
Lake Oswego's Tree Code covers removal of trees, and the city says a tree application goes to Planning at the same time as the building application. A re-roof under heavy canopy can pull in both. New tree regulations take effect October 1, 2026, so check the date before you plan work near trees.
PGE and state e-permitting
The city franchise list names PGE, so that is the utility we coordinate the shutdown with. Permits, including electric, run through the state e-permitting system. Residential structure permits were listed at 2 to 3 weeks for first review as of July 2026, so we line up the paperwork early.
Read first: removal and reinstall
Start with our removal and reinstall guide and roof first, or solar first. Putting solar on a house for the first time? See new solar installation in Lake Oswego.
Who does the work
Energy Solutions has been doing this since 2013. Licensed electricians are on our own crew, with 50+ years of combined team experience, under Oregon CCB license 202002. We are rated 5.0 on Google across 106 reviews.
Near Lake Oswego
Lake Oswego is in Clackamas County. Nearby: West Linn, Tigard, Portland. Ready? Request a free quote or call (971) 526-5545.
Questions we hear a lot
Do I need a tree permit for a Lake Oswego re-roof?
Only if trees are removed or protected. Those applications go to Planning with the building application.
Can you take panels off a house I just bought in Lake Oswego?
Yes. We work on systems we did not install.
How long does Lake Oswego permitting take?
The city listed 2 to 3 weeks for first review of residential structure permits as of July 2026.